By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
bitcoin
Bitcoin (BTC) $ 71,413.00
ethereum
Ethereum (ETH) $ 2,111.78
xrp
XRP (XRP) $ 1.40
tether
Tether (USDT) $ 0.999978
solana
Solana (SOL) $ 88.88
bnb
BNB (BNB) $ 657.23
usd-coin
USDC (USDC) $ 0.999941
dogecoin
Dogecoin (DOGE) $ 0.096406
cardano
Cardano (ADA) $ 0.267422
staked-ether
Lido Staked Ether (STETH) $ 2,265.05
tron
TRON (TRX) $ 0.291768
chainlink
Chainlink (LINK) $ 9.17
avalanche-2
Avalanche (AVAX) $ 9.79
wrapped-bitcoin
Wrapped Bitcoin (WBTC) $ 76,243.00
wrapped-steth
Wrapped stETH (WSTETH) $ 2,779.67
the-open-network
Toncoin (TON) $ 1.32
stellar
Stellar (XLM) $ 0.163977
hedera-hashgraph
Hedera (HBAR) $ 0.095069
sui
Sui (SUI) $ 1.00
shiba-inu
Shiba Inu (SHIB) $ 0.000006
weth
WETH (WETH) $ 2,268.37
leo-token
LEO Token (LEO) $ 9.07
polkadot
Polkadot (DOT) $ 1.47
litecoin
Litecoin (LTC) $ 55.76
bitget-token
Bitget Token (BGB) $ 2.16
bitcoin-cash
Bitcoin Cash (BCH) $ 463.59
hyperliquid
Hyperliquid (HYPE) $ 36.81
usds
USDS (USDS) $ 0.999955
uniswap
Uniswap (UNI) $ 4.03
cryptoprune cryptoprune
  • MarketCap
  • Crypto Bubbles
  • Multi Currency
  • Evaluation
  • Home
  • News
  • Crypto
    • Altcoins
    • Bitcoin
    • Blockchain
    • Cardano
    • Ethereum
    • NFT
    • Solana
  • Market
  • Mining
  • Exchange
  • Regulation
  • Metaverse
Crypto PruneCrypto Prune
  • Home
  • News
  • Crypto
    • Altcoins
    • Bitcoin
    • Blockchain
    • Cardano
    • Ethereum
    • NFT
    • Solana
  • Market
  • Mining
  • Exchange
  • Regulation
  • Metaverse

Search

  • Home
  • News
  • Crypto
    • Altcoins
    • Bitcoin
    • Blockchain
    • Cardano
    • Ethereum
    • NFT
    • Solana
  • Market
  • Mining
  • Exchange
  • Regulation
  • Metaverse

Latest Stories

A bridge between crypto assets and traditional assets
A bridge between crypto assets and traditional assets
image
Argentine neobank Huala raises $195 million to fund Latin American expansion
image
ITC founder talks about characteristics that define a Bitcoin bear market and why BTC is already in a bear market
image
Chainlink strengthens integration of cbtc token as first wrapped bitcoin asset on Canton Network
Hardware crypto wallet and Bitcoin coin on a bedside table as a masked intruder enters a home, illustrating rising physical security risks tied to Bitcoin self-custody for everyday investors in France
BlackRock’s new product makes Ethereum revenue impossible to ignore
© 2025 All Rights reserved | Powered by Crypto Prune
Crypto Prune > Mining > Bitcoin miners post record profits in second quarter as HPC push accelerates, JP Morgan announces
Mining

Bitcoin miners post record profits in second quarter as HPC push accelerates, JP Morgan announces

5 months ago 2 Min Read

Wall Street bank JP Morgan (JPM) said the second quarter and summer of 2025 will be a transformative time for Bitcoin. BTC$123,012.36 The miner features record cash operating profits and a focus on high-performance computing (HPC).

Cipher Mining’s (CIFR) 244 megawatt (MW) colocation agreement with Fluidstack and IREN’s (IREN) expansion to more than 23,000 GPUs highlight that shift, the bank said in a report Tuesday.

Despite the soaring hashrate, analysts at the bank noted that miners’ gross profits increased quarter-over-quarter, supported by higher Bitcoin prices and a more efficient fleet.

Analysts said production costs rose slightly due to increased competition and increased investment in high-performance computing (HPC). IREN and Cipher had the lowest power costs per mined Bitcoin at around $29,000 and $31,200, while MARA (MARA) had the highest at around $56,200. On a full load basis (power + cash SG&A), IREN and CleanSpark (CLSK) lead with costs of $54,000 and nearly $60,000 per coin, compared to RIOT’s $81,000. The average price of Bitcoin during the quarter was around $98,500, and most operators made a profit.

The miner also accelerated fundraising, issuing about $590 million in new stock, a significant increase from the first quarter, with much of it going to HPC projects, JPMorgan said. IREN has raised $263 million to complete a 50 exahash expansion and begin construction of a 75MW water-cooled data center called Horizon 1. Group-wide capital expenditures totaled approximately $900 million, below their peak in late 2024, but increasing since then.

Miners collectively spent a record $2.1 billion on energy, but gross profits held steady at about $2.1 billion, with a profit margin of nearly 53%, analysts estimated.

See also  Bitcoin miner Greenwich settles New York permit dispute, prompting stock price to soar

The bank said Bitcoin’s strength and efficiency gains continue to offset network growth and maintain profitability even as competition increases.

Read more: Bitcoin miner market cap hits record in September: JP Morgan

TAGGED:MiningMining NewsNews
Leave a comment Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RELATED NEWS

image

Bitcoin Exchange Binance announces a list of two new Altcoin trading pairs from Futures Platform! Here’s the details

By Crypto Prune 8 months ago
CleanSpark reports strong Bitcoin mining results for April

CleanSpark reports strong Bitcoin mining results for April

By Crypto Prune 10 months ago
image

Mara stocks jump as Q2 earnings beat Wall Street expectations thanks to a surge in BTC prices

By Crypto Prune 8 months ago
Coinbase makes a key announcement at this year's important cryptocurrency summit

Coinbase makes a key announcement at this year’s important cryptocurrency summit

By Crypto Prune 9 months ago
cryptoprune

© 2025 All Rights reserved | Powered by Crypto Prune

  • Altcoins
  • Bitcoin
  • Blockchain
  • Cardano
  • Ethereum
  • Exchange
  • Market
  • Metaverse
  • Mining
  • News
  • Crypto
  • NFT
  • Solana
  • Regulation
  • Technology
  • About Us
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms of Service
Welcome Back!

Sign in to your account

Lost your password?