By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
bitcoin
Bitcoin (BTC) $ 70,776.00
ethereum
Ethereum (ETH) $ 2,154.06
xrp
XRP (XRP) $ 1.45
tether
Tether (USDT) $ 0.999809
solana
Solana (SOL) $ 90.16
bnb
BNB (BNB) $ 642.99
usd-coin
USDC (USDC) $ 0.999948
dogecoin
Dogecoin (DOGE) $ 0.094824
cardano
Cardano (ADA) $ 0.266392
staked-ether
Lido Staked Ether (STETH) $ 2,265.05
tron
TRON (TRX) $ 0.31049
chainlink
Chainlink (LINK) $ 9.12
avalanche-2
Avalanche (AVAX) $ 9.61
wrapped-bitcoin
Wrapped Bitcoin (WBTC) $ 76,243.00
wrapped-steth
Wrapped stETH (WSTETH) $ 2,779.67
the-open-network
Toncoin (TON) $ 1.26
stellar
Stellar (XLM) $ 0.16639
hedera-hashgraph
Hedera (HBAR) $ 0.093344
sui
Sui (SUI) $ 0.968105
shiba-inu
Shiba Inu (SHIB) $ 0.000006
weth
WETH (WETH) $ 2,268.37
leo-token
LEO Token (LEO) $ 9.22
polkadot
Polkadot (DOT) $ 1.51
litecoin
Litecoin (LTC) $ 56.27
bitget-token
Bitget Token (BGB) $ 2.14
bitcoin-cash
Bitcoin Cash (BCH) $ 471.57
hyperliquid
Hyperliquid (HYPE) $ 39.43
usds
USDS (USDS) $ 0.999968
uniswap
Uniswap (UNI) $ 3.60
cryptoprune cryptoprune
  • MarketCap
  • Crypto Bubbles
  • Multi Currency
  • Evaluation
  • Home
  • News
  • Crypto
    • Altcoins
    • Bitcoin
    • Blockchain
    • Cardano
    • Ethereum
    • NFT
    • Solana
  • Market
  • Mining
  • Exchange
  • Regulation
  • Metaverse
Crypto PruneCrypto Prune
  • Home
  • News
  • Crypto
    • Altcoins
    • Bitcoin
    • Blockchain
    • Cardano
    • Ethereum
    • NFT
    • Solana
  • Market
  • Mining
  • Exchange
  • Regulation
  • Metaverse

Search

  • Home
  • News
  • Crypto
    • Altcoins
    • Bitcoin
    • Blockchain
    • Cardano
    • Ethereum
    • NFT
    • Solana
  • Market
  • Mining
  • Exchange
  • Regulation
  • Metaverse

Latest Stories

According to Lummis, transactions regarding stablecoin interests are 99% ready.
According to Lummis, transactions regarding stablecoin interests are 99% ready.
image
XRP’s 10% on-chain metric surge signals increased selling activity
Cracked bond plaque revealing a Bitcoin beneath on a rain-soaked city street, symbolizing Britain’s bond market turmoil shifting attention toward Bitcoin
UK bond panic now claims Bitcoin, but many seem to have forgotten
Bitcoin
How far will Bitcoin price fall? Analysts share worst-case scenario
Meta's internal AI caused sensitive data leak
Meta’s internal AI caused sensitive data leak
© 2025 All Rights reserved | Powered by Crypto Prune
Crypto Prune > Mining > CleanSpark beats Microsoft with 100 MW AI site in Wyoming, making crypto miner king of infrastructure
Mining

CleanSpark beats Microsoft with 100 MW AI site in Wyoming, making crypto miner king of infrastructure

5 months ago 4 Min Read

CleanSpark, a Bitcoin miner in Las Vegas, is currently building an AI data center alongside its mining operations.

The company continues to operate its Bitcoin business while transitioning to artificial intelligence infrastructure.

The CEO explained the plan on CNBC’s “Crypto World” and said the model is likely to become popular among miners. CleanSpark recently beat Microsoft in a deal, winning a 100-megawatt site in Cheyenne, Wyoming.

The CEO said the deciding factor was speed. CleanSpark built a 100-megawatt mining site in about six months, but building a full AI data center will take three to six years.

“We were able to scale up and install a 100 megawatt Bitcoin mining facility in about six months,” said CEO Matt Schultz. “Indeed, Cheyenne chose CleanSpark because our balance sheet was stronger than Microsoft’s.”

The company used to operate as an energy company, but transitioned into Bitcoin mining five years ago. Schultz said the shift takes the company back to its roots, as competition now revolves around access to electricity.

CleanSpark currently operates 1.03 GW of active facilities and plans to operate 1.7 GW. Schultz describes this model as “megawatt monetization,” using Bitcoin mining to rapidly expand power infrastructure and transform selected locations into high-performance computing for rational AI.

He said Bitcoin miners can quickly build and power data centers, but access to power is the main barrier for everyone in the space.

CleanSpark expands to AI campus

CleanSpark announced a partnership with data center engineering firm Submer to develop AI-focused campuses across North America. The plan combines CleanSpark’s energy and land assets with Submer’s water-cooled high-density systems.

See also  Eric Trump’s mining company acquires an additional 416 BTC

“We are in a position to deliver gigawatts of AI power faster, cleaner and more efficiently than traditional approaches,” Schultz said. He said the goal is to turn CleanSpark’s infrastructure platform into the backbone of the next phase of computing.

One area Schultz pointed to as a growing area for AI clusters is Atlanta, which he said is second only to Northern Virginia on the East Coast in data center development.

Running AI models consumes a lot of power. Companies like Amazon, Google and Microsoft are spending millions on new data centers and signing contracts with power companies to build new nuclear reactors or restart old ones.

Even with that much spending, many new projects face long delays in connecting to the grid. “Hyperscalers are spending 60% of their free cash flow on capital expenditures and trying to catch up with AI,” Schultz said.

He added that miners already control what is most difficult to secure, such as land, substations and direct access to electricity.

Cryptocurrency margins shrink as dual-track model grows

CleanSpark stock is up more than 100% this year. The shift to AI is helping offset the tightening of Bitcoin mining profits after April’s halving cut block rewards in half.

CleanSpark reported third-quarter fiscal 2025 revenue of $198.6 million, an increase of nearly 91% year-over-year, and held 12,703 Bitcoins in its treasury.

Schultz said the AI ​​movement will not replace crypto revenues. “It (Bitcoin mining) is a great part of our business,” he said.

CleanSpark’s power model allows mining operations to be stopped and power returned to the utility company when the grid is stressed, something that cannot be easily done with an AI center.

See also  See the six exchanges listing pump tokens for trading

Schultz said the combination of mining and AI gives utilities flexibility. During Hurricane Helen in Georgia, CleanSpark shut off power and redirected energy. “Within an hour, the hospital lights were back on,” he said.

TAGGED:MiningMining NewsNews
Leave a comment Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RELATED NEWS

image

Enter Bitcoin mining through DL Holdings Convertible-Bond trading

By Crypto Prune 5 months ago
image

Anti-CZ whale loses $61 million in profits in 10 days on Hyperliquid

By Crypto Prune 4 months ago
German Fintech Ivy unlocks seamless USDC Eurc integration

German Fintech Ivy unlocks seamless USDC Eurc integration

By Crypto Prune 9 months ago
image

Spot trading volume in concentrated markets declines for fifth consecutive month

By Crypto Prune 1 week ago
cryptoprune

© 2025 All Rights reserved | Powered by Crypto Prune

  • Altcoins
  • Bitcoin
  • Blockchain
  • Cardano
  • Ethereum
  • Exchange
  • Market
  • Metaverse
  • Mining
  • News
  • Crypto
  • NFT
  • Solana
  • Regulation
  • Technology
  • About Us
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms of Service
Welcome Back!

Sign in to your account

Lost your password?